On a low plain north of Tokyo, Japan dug a river under its own towns. When small rivers rise, their water drops into deep shafts, crosses a hall of 59 pillars and is pumped into a bigger river. In 2019, a typhoon tested it.

EP2221 sources
Plays from YouTube (youtube-nocookie.com) when you press play.

Japan stops floods on the low plain north of Tokyo by giving the water somewhere else to go. When the plain’s small rivers rise, they spill into five shafts about 70 meters deep, flow through a tunnel about 6.3 km long, some 50 meters underground, and reach a hall of 59 giant pillars that people call the underground temple (Edogawa River Office; Edogawa River Office; Edogawa River Office). Next door, four pumps lift up to 200 cubic meters a second into the Edogawa, a bigger river with room to spare (Edogawa River Office; Edogawa River Office).

Its official English name is the Metropolitan Area Outer Underground Discharge Channel. In the 2019 typhoon, with a little more rain than a 1982 storm that flooded more than 36,000 homes, the ministry estimates that this channel and the basin’s other pump stations together cut the number of flooded homes by about 90% (MLIT; Edogawa River Office; Kanto Regional Bureau). On its own, it cannot stop every flood, and the people who run it say so.

The plain: a dish between three rivers

Look at the land north of Tokyo and the problem is plain. The Naka and Ayase basin is boxed in by three big rivers, the Tone, the Edogawa and the Arakawa, and Japan’s river ministry describes it as a dish-shaped landscape where water collects easily (Edogawa River Office). A large share of it lies less than 10 meters above sea level, and smaller rivers such as the Naka and the Ayase wind across its flat bottom (MLIT).

Shaded relief map of the Kanto Plain with land under 10 meters above sea level filled in blue: a broad blue band runs north from Tokyo Bay at the bottom center through the plain, with branching blue valleys to the east, while the mountains to the west stay brown.
Land under 10 meters above sea level (blue) around Tokyo Bay and the plain to its north. Elevation: Geospatial Information Authority of Japan (GSI). Map by Hanko.

Then the homes came. Rapid urbanization filled the dish faster than its rivers and sewers could be improved, and the basin flooded again and again (Edogawa River Office). In September 1958, a typhoon flooded 41,544 homes here. In September 1982, a typhoon flooded 36,425. In September 1991, another flooded 31,431 (MLIT).

The video follows one house on this plain through those floods. It is a fictional stand-in, not a real address, for the tens of thousands of homes behind those counts. Each time, a house like it would have been bailed out, dried and repaired.

Why it went underground

The plan was to push part of each flood into a bigger river with room to spare: the Edogawa, on the rim of the dish. The channel takes water from five small waterways, the Naka, Kuramatsu, Ootoshi-furutone and Komatsu rivers and a channel called Waterway No. 18 (Edogawa River Office).

Between those rivers and the Edogawa sat kilometers of towns, roads and homes. A canal on the surface would have affected how the land could be used in future and risked dividing the community, the river office says, and buying the land would take time. Going underground was the faster way to get the benefit (Edogawa River Office).

The tunnel: a river 50 meters down

The tunnel follows National Route 16, about 50 meters below the road, deeper than the subway (Edogawa River Office). The depth was set to put the tunnel into a stable layer of old, firm diluvial ground (Kanto Regional Bureau).

It takes three parts: shafts to catch the water, a tunnel to carry it and pumps to push it out. There are five shafts, concrete cylinders about 70 meters deep and about 30 meters across inside (Edogawa River Office). Measured one by one, they are dug from 68.8 to 76.5 meters deep; the deepest is Shaft 1, and the shafts’ underground walls reach as deep as 140 meters (Edogawa River Office).

Four of the shafts sit beside rivers, behind a low stretch of bank called an overflow levee. When a river rises past it, the water spills over and falls in on its own; Shaft 1 has no river inlet of its own (Edogawa River Office). A drop of 60 meters would pound the floor, so in Shafts 3 and 5 the water spirals down the walls to soften the impact (Edogawa River Office). Screens at the inlets catch debris before it goes in (Edogawa River Office).

Linking all five is one tunnel, about 6.3 km long and about 10 meters across inside, running from Kamikanasaki to Kobuchi in the city of Kasukabe (Edogawa River Office). The pamphlet gives the inner diameter as 10.6 meters (Edogawa River Office).

Cross-section illustration: a small river and houses at ground level, a deep shaft dropping through layers of soil to a long horizontal tunnel, which rises into a pillared underground hall and then to pumps that discharge into a wide river on the right; a red line traces the water's path.
The water's path: river, shaft, tunnel, surge tank ("the temple"), pumps, Edogawa. Schematic, not to scale. Illustration from the video. Sources: MLIT Edogawa River Office.

Deeper, emptier and twice the price

Construction ran from March 1993 to June 2006 (Kanto Regional Bureau). The ground had a surprise. The firm layer turned out to be deeper than expected, and the tunnel had to drop about 10 meters (Kanto Regional Bureau). The machines that bored it came from another giant project: shield machines that assembled the tunnel lining automatically, developed for the Tokyo Bay Aqua-Line (Kanto Regional Bureau).

The plan changed too. At first, the tunnel was meant to stay full of water all the time. Standing water would rot and smell, and a full tunnel is hard to inspect or clear of mud, so in fiscal 1992 the design switched to keeping it empty between floods (Kanto Regional Bureau). Pumps and elevators for draining the leftover water added about ¥4 billion (Kanto Regional Bureau). The empty tunnel paid off in March 2011: when the great earthquake struck, it was winter and the tunnel held almost no water, so it could be inspected right away (Kanto Regional Bureau).

Even one shaft had to move. Model tests showed that Shaft 5’s inlet needed a channel 80 meters long instead of 40 to calm the flow, and the original site was next to a school. The inlet moved to a site beside a factory, and the land talks were hard (Kanto Regional Bureau).

Japan didn’t wait for all of it. A 3.3 km section went to work in June 2002, and the whole channel opened in June 2006 (Kanto Regional Bureau). It cost about ¥230 billion, took about five years longer than planned and ended up more than double the original budget (Kanto Regional Bureau), which a committee chair put at about ¥100 billion (Kanto Regional Bureau).

At a review in fiscal 2011, one committee member said that misjudged ground conditions alone could not explain it. The ministry’s answer was that no underground channel this deep and this wide had been built before, and that the work had become a matter of trial and error (Kanto Regional Bureau; Kanto Regional Bureau). Its own review lists the lessons: technical studies came after the project had started, and maintenance and the environment were not studied enough at first (Kanto Regional Bureau).

The temple: built heavy on purpose

Water that has raced through the tunnel hits hard, so something has to calm it before the pumps. That is the hall. On paper it is a pressure-control tank, or surge tank; almost everyone else calls it the underground temple (Edogawa River Office). About 79,000 people a year come to walk among its pillars, by a 2026 ministry count (Kanto Regional Bureau); ministry staff put fiscal 2024 at about 68,000 (MLIT). In 2025 the river office even published it as a Minecraft world (Edogawa River Office).

It sits 22 meters underground and measures 177 meters long, 78 meters wide and 18 meters from floor to ceiling. The town above uses its roof as a soccer field (Edogawa River Office). Inside stand 59 pillars, each 7 by 2 meters across and 18 meters tall, and each weighing about 500 tonnes (Edogawa River Office).

Cut-away illustration: players on a green soccer field at ground level, with houses behind, and directly beneath it a wide underground hall lined with rows of square concrete pillars and a few small visitors walking.
The soccer field on the roof and the hall 22 meters down. Not to scale. Illustration from the video. Source: MLIT Edogawa River Office.

The pillars do hold up the roof, but they have a second job. The ground here is soaked with groundwater, which pushes up on the empty tank hard enough that it could float. The weight of the structure holds it down (Edogawa River Office).

Why it looks like a temple

The shape came from the engineering, one step at a time. The first plan had pumps of 100 cubic meters a second, driven by diesel engines; the final design doubled that to 200 (Kanto Regional Bureau). With that much water, a sudden pump stop could send a surge back, and absorbing it without backflow called for a floor of about 12,000 square meters. A floor that big wants to float, so the roof, floor and walls were made about 3 meters thick. And to carry the heavy roof slab, it took 59 pillars of 2 by 7 meters (Kanto Regional Bureau).

So the hall has two everyday jobs: slowing the water from the tunnel so it can flow smoothly to the pumps, and taking the surge if the pumps stop suddenly (Edogawa River Office). The office’s director calls the whole system a hybrid that can hold water underground or pump it out, and says no other facility has that function at present (MLIT).

The pumps: a pool a second

Next door, at the pump station, four pumps of 50 cubic meters a second each can move 200 cubic meters every second. The ministry compares that to a school’s 25-meter swimming pool, every second. They lift the water 14 meters, which the river office calls the highest lift in Japan, and the inlet gates and pumps are run by computer (Edogawa River Office).

Illustration of a large underground pump hall: four tall blue pumps in a row, each with a vertical pipe rising to the ceiling, and two workers in orange vests standing between them for scale.
Four pumps, 50 m³ a second each, lift the water 14 meters to the Edogawa. Illustration from the video, not a photograph. Source: MLIT Edogawa River Office.

They are driven by gas turbines adapted from ones developed for aircraft, 14,000 horsepower each (Edogawa River Office; Edogawa River Office). The river office’s own newsletter describes them as the same engine as a Boeing 737; we did not check the engine model ourselves (Edogawa River Office). Choosing gas turbines let the building be smaller and saved about ¥1.5 billion (Kanto Regional Bureau). Two underground tanks hold 650 kiloliters of fuel, enough to run all four pumps for three days (Edogawa River Office).

The water leaves through six outlet sluices, each 5.4 by 4.2 meters, into the Edogawa. The same sluices stop the Edogawa from flowing back in (Edogawa River Office).

The test: Typhoon Hagibis, 2019

In October 2019, Typhoon Hagibis, No. 19 of that year, headed for this part of Japan. Across the basin it dropped an average of about 217 mm of rain (Kanto Regional Bureau), about 1.1 times the rain of the September 1982 storm (Edogawa River Office).

At 11:30 on October 12, water began spilling into Shaft 2, about seven and a half hours before the typhoon made landfall. The other rivers followed through the afternoon, and at 17:50 the Naka began pouring in too: all five rivers were now flowing into the channel (Kanto Regional Bureau). The pumps did not start right away. The plan is to let water build up in the tunnel first (Kanto Regional Bureau). At 18:50 the first pump came on (Kanto Regional Bureau).

Overnight, at 4:50 on October 13, the Naka River at Yoshikawa still rose past its flood-danger level. Without this channel and the nearby Misato discharge channel, MLIT estimates it would have stayed above that level for about 28 hours and peaked about 30 cm higher; it lasted about four (Kanto Regional Bureau). The Edogawa rose too, peaking at 7.75 meters at Noda, about 1.35 meters below its danger level of 9.10 meters (Kanto Regional Bureau).

The pumps ran for about 68 hours. The last one stopped at 15:13 on October 15, and water kept trickling in until 1:10 on October 16 (Kanto Regional Bureau). In all, the channel handled about 12.18 million cubic meters, about ten Tokyo Domes’ worth and the third-largest volume in its history at the time (Edogawa River Office).

About 90% fewer flooded homes, but not alone

In 1982, more than 36,000 homes flooded in this basin. In 2019, with a little more rain, MLIT estimates about 90% fewer homes flooded (Edogawa River Office; Kanto Regional Bureau). That figure is for the channel together with the basin’s other pump stations; the ministry’s heading credits “the Outer Underground Discharge Channel and others” (Kanto Regional Bureau; MLIT). For the channel on its own, MLIT’s simulation credits about ¥26.4 billion less flood damage in that typhoon (Edogawa River Office).

The other stations did more of the pumping. Of the 54.7 million cubic meters pumped out of the basin in 2019, the Misato pump station moved 32.7 million, this channel’s pump station 12.2 million and the Ayase station 9.8 million (Kanto Regional Bureau). By our calculation, this channel’s share was about a fifth (our math). Since 1991, the basin’s total pumping capacity has roughly tripled, from 150 to 500 cubic meters a second (Kanto Regional Bureau). And the stand-in house? In a storm like this one, it most likely stayed dry.

After the storm: mud on the temple floor

Floodwater carries mud, and it leaves some behind in the tunnel. Every two or three years, crews dig it out. In fiscal 2013 they removed about 5,000 cubic meters over about half a year, lifting it to the surface in containers through Shafts 2 and 4, drying it for about a year and reusing it as material for river banks (Edogawa River Office). The temple floor gets mud too; after it is cleared, staff inspect the floor and the pillars (Edogawa River Office).

From 2002 to late 2025, the channel took in floodwater 150 times, and in 81 of those the pumps ran to send it into the Edogawa (MLIT). That leaves 69 times when the tunnel and shafts simply held the water (our math). On average the channel takes in water about seven times a year (Edogawa River Office); in 2020, for example, it did so eight times, and the pumps ran twice (Edogawa River Office).

Over about 21 years, from June 2002 to June 2023, MLIT estimates the channel prevented about ¥162.6 billion of flood damage; the largest single-flood figure, about ¥37.3 billion, is for September 2015 (Edogawa River Office). By our calculation, that is about 70% of what it cost (our math).

What it can’t do

It only handles the small and medium rivers. The giant rivers around the plain, which form the rim of the dish, were never its job (Edogawa River Office; Edogawa River Office). It has a ceiling: 200 cubic meters a second and no more (Edogawa River Office). And it does not work alone. Even in 2019, with the channel and the basin’s other stations running, the Naka spent hours above its danger level (Kanto Regional Bureau).

The people who run it do not claim otherwise. Ministry staff at the river office say that rain is changing with global warming and that floods are growing more severe and frequent, so while levees and other works go on, the defense has to spread across the whole basin, an approach Japan calls basin-wide flood control (MLIT).

Somewhere else to go

So Japan stops floods on this plain by giving the rain somewhere else to go: over a low bank, down a shaft, along a tunnel under the towns, through a hall built heavy so it won’t float, and out to a bigger river. In a storm a little bigger than 1982’s, that helped cut flooded homes by about nine tenths, working alongside the basin’s other pumps.

The stand-in house still sits on the same low ground. On most storm nights now, the rain has somewhere to go. And under a quiet town north of Tokyo, 59 pillars are holding the temple down.

For the previous episode in this series, see How a Katana Is Still Made in Japan, Step by Step.

How we worked it out

  • About 70% of its cost is our arithmetic: MLIT estimates about ¥162.6 billion of flood damage prevented from June 2002 to June 2023, and the channel cost about ¥230 billion (162.6 ÷ 230 = 0.71). The damage figure comes from simulating what would have flooded without the channel; it is an estimate, not a measured saving.
  • Two more small calculations: about a fifth of the water pumped out of the basin in 2019 is 12.2 ÷ 54.7 million m³, about 22%; and the 69 times the channel held water without pumping is 150 intakes minus 81 pump runs. The roughly 90% fewer flooded homes in 2019 is MLIT's estimate for the channel together with the basin's other pump stations, compared with the September 1982 storm; MLIT credits the channel alone with about ¥26.4 billion less damage in that typhoon.
  • The house in the video is a fictional stand-in for the homes on this plain, not a real address; the flood counts it stands for are MLIT's. Our map's low ground is drawn from elevation tiles of the Geospatial Information Authority of Japan (GSI); the river lines in the video are approximate. Drawings and maps are by Hanko; people in them are illustrations, not portraits.

Corrections

No corrections so far. Spotted an error? Tell us in the video’s comments; corrections are listed here and pinned under the video.

Sources

  1. MLIT Edogawa River Office: Surge tank (pressure-control tank) (in Japanese) · accessed 2026-10-31
  2. MLIT Edogawa River Office: Why has this area flooded again and again? (in Japanese) · accessed 2026-10-31
  3. MLIT: Rivers of Japan: the Naka and Ayase, overview (in Japanese) · accessed 2026-10-31
  4. MLIT: Rivers of Japan: the Naka and Ayase, major floods (in Japanese) · accessed 2026-10-31
  5. MLIT Edogawa River Office: What is the Metropolitan Area Outer Underground Discharge Channel? (in Japanese) · accessed 2026-10-31
  6. MLIT Edogawa River Office: Tunnel (in Japanese) · accessed 2026-10-31
  7. MLIT Edogawa River Office: Shafts (in Japanese) · accessed 2026-10-31
  8. MLIT Edogawa River Office: Shafts: dimensions of each shaft (in Japanese) · accessed 2026-10-31
  9. MLIT Edogawa River Office: Sairyu no Kawa: the giant underground discharge channel (pamphlet, current edition; in Japanese, PDF) · accessed 2026-10-31
  10. MLIT Kanto Regional Bureau: Post-project evaluation: Naka and Ayase river improvement (Metropolitan Area Outer Underground Discharge Channel), fiscal 2011 (in Japanese, PDF) · accessed 2026-10-31
  11. MLIT Kanto Regional Bureau: Project evaluation monitoring committee, fiscal 2011, 10th meeting: minutes (in Japanese, PDF) · accessed 2026-10-31
  12. MLIT Edogawa River Office: Pump station (in Japanese) · accessed 2026-10-31
  13. MLIT Edogawa River Office: Newsletter Sairyu no Kawadayori No. 35 (August 2013; in Japanese, PDF) · accessed 2026-10-31
  14. MLIT Edogawa River Office: Newsletter Sairyu no Kawadayori No. 38 (February 2014; in Japanese, PDF) · accessed 2026-10-31
  15. MLIT Edogawa River Office: Newsletter Sairyu no Kawadayori No. 63 (April 2020; in Japanese, PDF) · accessed 2026-10-31
  16. MLIT Edogawa River Office: Newsletter Sairyu no Kawadayori No. 64 (January 2021; in Japanese, PDF) · accessed 2026-10-31
  17. MLIT Kanto Regional Bureau: Typhoon No. 19 (Hagibis), October 2019: flood summary, Edogawa River Office (in Japanese, PDF) · accessed 2026-10-31
  18. MLIT: The Outer Underground Discharge Channel and other facilities reduce damage in the Naka and Ayase basin: flash report (in Japanese, PDF) · accessed 2026-10-31
  19. MLIT: Staff interview at the Edogawa River Office (interviewed December 2025; in Japanese) · accessed 2026-10-31
  20. MLIT Kanto Regional Bureau: Press release: 20th-anniversary photo exhibition at the discharge channel (July 2026; in Japanese, PDF) · accessed 2026-10-31
  21. MLIT Edogawa River Office: Minecraft world data of the discharge channel (in Japanese) · accessed 2026-10-31

Read next